Since January 2011, the company Latomia Ermionidas S.A. has contracted with “Aderes Aioliki S.A.” the construction of 3 wind farms in the municipality Hermione and specially at the area "Soros" with power 9MW, at the area"Astrapi" with power 8MW and at the area "Shambhales" with power 16MW.
The project includes:
-Construction of roads which connect the wind turbines and the substation.
-The configuration of plateau for the substation and the excavation of foundations of walls
-The configuration of plateau for wind turbines
-Excavation and consolidation of the wind turbines bases
-Excavation and filling ditches cable
-Materials trasportation
-Excavation and concreting of the wind turbines web